Get a Fast Quote
🛠️ Need the Right HVAC Tool for the Job?
Whether you're quoting a bulk order or chasing hard-to-find tools, we’re here to help.
Get a fast, personalised quote—no pressure, no spam!
Fill out the form below and we’ll get back to you ASAP.
📩 Request a Quote
Description
This is a direct replacement circuit board for Braemar 5 Star ducted gas heaters, designed to get your unit back up and running. It’s a critical component for controlling your heater’s functions, ensuring reliable and efficient operation.
When a control board fails, especially during a chilly Australian winter, the whole heating system stops. Having the right replacement on hand, or knowing you can get it quickly, saves call-backs and keeps customers warm.
Best For
- HVAC technicians and gas fitters servicing Braemar ducted heating systems.
- Service and maintenance teams requiring genuine Braemar spares.
- Competent DIY owners comfortable with electrical work on their own Braemar 5 Star units.
Compatibility
- Braemar 5 Star ducted gas heaters: TH5 models
- Braemar 5 Star ducted gas heaters: THM6 models
- Braemar 5 Star ducted gas heaters: TSS models
If you're running a different model, check fittings and specs before ordering.
Features
- Direct replacement for specific Braemar 5 Star ducted gas heater models.
- Genuine part, ensuring proper integration and long-term reliability for your system.
- Controls critical heating functions, from ignition sequence to fan operation.
- Designed to meet original equipment manufacturer specifications for performance.
Technical Specifications
| Specification | Detail |
|---|---|
| Part Number (HVAC Shop) | SY639468 |
| Part Number (Seeley) | 639468 |
| Suits Models | TH5, THM6, TSS (5 Star) |
What's in the Box
- 1 x Braemar 5 Star Ducted Heater Circuit Board (SY639468)
Using It on the Job
- Always isolate power to the ducted heater at the main switchboard and apply a lockout tagout device before commencing any work.
- Disconnect existing wiring from the old circuit board, carefully labelling each connection point or taking clear photos for reference.
- Carefully remove the old control board and install the new Braemar SY639468 board, ensuring all mounting points are secure and components are seated correctly.
- Reconnect all wiring, double-checking against your labels or diagrams for correct polarity and position to avoid damage.
- Restore power to the unit and test the heater’s operation through all modes (heating, fan only, etc.) to confirm full functionality.
- Check for any fault codes via the wall controller and address them as per the Braemar service manual if they appear.
Limitations & Safety Notes
- Installation requires a qualified HVAC technician or licensed gas fitter due to electrical and gas connections.
- Ensure power is completely isolated and locked out before attempting any work on the unit.
- Only compatible with Braemar 5 Star TH5, THM6, and TSS ducted heater models.
- Always follow Australian electrical and gas safety standards, along with manufacturer guidelines, during installation and testing.
Before you pull that old board out, grab your phone and snap a few clear photos of the wiring. It's a lifesaver when you're hooking up the new one, especially on a dusty roof space or in a tight cupboard.
Pair With
Pair with Braemar wall controllers or other Braemar ducted heater spares for comprehensive system maintenance and troubleshooting.
Common Questions for Braemar 5 Star Ducted Heater Circuit Board
Any question?
If we still haven't answered your question, you can contact us below and we will get back to you as soon as possible.

















