No reviews

Bonaire H2Optimiser Upgrade Kit for Pinnacle Evaporative Coolers

Regular price
$970.00
Sale price
$970.00
Regular price
$0
Sold out
Unit price
Quantity must be 1 or more

This Bonaire H2Optimiser Upgrade Kit is built to give your Pinnacle evaporative cooler a smart boost, making it run more efficiently and giving you better control over your system. It's a straight swap for the original board.

If you've been working on an older Pinnacle unit, you know these upgrades can often breathe new life into an aging system, especially after a few scorching Aussie summers where control consistency can vary.

Best For

  • Bonaire Pinnacle evaporative cooler service technicians
  • HVAC maintenance and repair teams
  • Competent DIY owners maintaining their own Bonaire Pinnacle units

Compatibility

This H2Optimiser Upgrade Kit is designed specifically for Bonaire Pinnacle evaporative cooling units. The upgrade board is a direct replacement for the original control board in these systems.

If you're running a different model, check fittings and specs before ordering.

Features

  • Genuine Bonaire evaporative upgrade board
  • Specifically suits Bonaire Pinnacle series units
  • Manufacturer's Part Number (PN) S6061642SP for easy identification
  • Designed to enhance control and efficiency of compatible units

What's in the Box

  • 1 x Bonaire H2Optimiser Evaporative Upgrade Board (PN S6061642SP)

Using It on the Job

  1. Isolate Power: Ensure the evaporative cooler's main power supply is switched off at the circuit breaker and locked out before commencing any work.
  2. Access Control Panel: Carefully open the unit's control panel, typically located near the fan motor or water inlet.
  3. Document Connections: Take clear photos of existing wiring connections to the old control board. Label wires if necessary to avoid confusion.
  4. Remove Old Board: Disconnect all wiring from the old board and unmount it from its housing.
  5. Install New Board: Mount the Bonaire H2Optimiser board in place and reconnect all wires according to your documentation and the kit's instructions.
  6. Test Operation: Restore power and thoroughly test all functions of the evaporative cooler, including fan speeds, pump operation, and water management.

Limitations & Safety Notes

  • Only for use with Bonaire Pinnacle evaporative cooling units. Verify your model before installation.
  • Installation involves electrical components; ensure power is isolated and always follow proper electrical safety procedures.
  • Refer to your unit's service manual and the kit's instructions for specific installation guidance.
  • Always follow Australian standards and Safe Work guidance when performing maintenance on HVAC equipment.

Tradie Pro Tip: Before you pull a single wire, snap a few clear photos of the existing board's connections. It'll save you a headache trying to remember which wire goes where, especially if you get called away mid-job.

Pair With

Pair with other Bonaire Control Boards or browse our range of Evaporative Cooler Spares to ensure your system is running in top condition.

Go to full site