This Bonaire H2Optimiser Upgrade Kit is built to give your Pinnacle evaporative cooler a smart boost, making it run more efficiently and giving you better control over your system. It's a straight swap for the original board.
If you've been working on an older Pinnacle unit, you know these upgrades can often breathe new life into an aging system, especially after a few scorching Aussie summers where control consistency can vary.
Best For
- Bonaire Pinnacle evaporative cooler service technicians
- HVAC maintenance and repair teams
- Competent DIY owners maintaining their own Bonaire Pinnacle units
Compatibility
This H2Optimiser Upgrade Kit is designed specifically for Bonaire Pinnacle evaporative cooling units. The upgrade board is a direct replacement for the original control board in these systems.
If you're running a different model, check fittings and specs before ordering.
Features
- Genuine Bonaire evaporative upgrade board
- Specifically suits Bonaire Pinnacle series units
- Manufacturer's Part Number (PN) S6061642SP for easy identification
- Designed to enhance control and efficiency of compatible units
What's in the Box
- 1 x Bonaire H2Optimiser Evaporative Upgrade Board (PN S6061642SP)
Using It on the Job
- Isolate Power: Ensure the evaporative cooler's main power supply is switched off at the circuit breaker and locked out before commencing any work.
- Access Control Panel: Carefully open the unit's control panel, typically located near the fan motor or water inlet.
- Document Connections: Take clear photos of existing wiring connections to the old control board. Label wires if necessary to avoid confusion.
- Remove Old Board: Disconnect all wiring from the old board and unmount it from its housing.
- Install New Board: Mount the Bonaire H2Optimiser board in place and reconnect all wires according to your documentation and the kit's instructions.
- Test Operation: Restore power and thoroughly test all functions of the evaporative cooler, including fan speeds, pump operation, and water management.
Limitations & Safety Notes
- Only for use with Bonaire Pinnacle evaporative cooling units. Verify your model before installation.
- Installation involves electrical components; ensure power is isolated and always follow proper electrical safety procedures.
- Refer to your unit's service manual and the kit's instructions for specific installation guidance.
- Always follow Australian standards and Safe Work guidance when performing maintenance on HVAC equipment.
Tradie Pro Tip: Before you pull a single wire, snap a few clear photos of the existing board's connections. It'll save you a headache trying to remember which wire goes where, especially if you get called away mid-job.
Pair With
Pair with other Bonaire Control Boards or browse our range of Evaporative Cooler Spares to ensure your system is running in top condition.